Halyard
- Jun 12
- 1 min read
Halyard has been onsite for the past several weeks and is currently framing both Assisted Living wings, with plans to begin framing the Skilled Nursing wing in the near future. Their team has done an excellent job maintaining momentum by working in multiple areas simultaneously, helping keep the overall project on schedule. To support this pace, Halyard utilizes a panelized wall system that arrives onsite in large, prefabricated sections. These wall panels are manufactured offsite and delivered in approximately 10-foot sections, allowing for faster installation, improved quality control, and greater efficiency compared to traditional stick framing methods.


Comments